RetroFit of an impregnation system
The core elements of the optimization are the installation of a second manipulator and a second polymerization basin, which prevent a parts jam in the system at high capacity utilization. At the same time, all work steps in the system were checked for efficiency and rescheduled if necessary. This involved optimizing the nozzle technology, pumps, media supply and transport technology. At the same time, the existing control technology was replaced with a modern Siemens S7 control system to ensure that all modernizations function optimally. Lifting aids for loading and unloading the baskets also ensure compliance with health and safety regulations and improved working ergonomics.
Your contact
Are you looking for a reliable partner for a similar project? Please do not hesitate to contact us.
Michael Brunst
Managing Director