Energy line 300m long

A new energy route with a length of 300m was planned and realized as a connecting route between the existing boiler house and a new gas turbine power plant. 


The delivery and assembly of the new pipe bridge construction was successfully completed by Antrok - including the prefabrication of the energy route at the Lohfelden site. The pipe bridge, with a steel weight of over 200 tons, a length of 300 meters and a maximum height of 9.5 meters, serves as a support system for several media lines leading from the old to the new gas turbine power plant. Three boilers and two gas turbines were piped into the new plant. Thanks to this measure, our customer is now able to cover the entire energy requirements of its production independently.

Your contact


Are you looking for a reliable partner for a similar project? Please do not hesitate to contact us.

Michael Brunst
Managing Director

Tel: +49 561 47562-0
michael.brunst@antrok.de

Consent to use.This website uses cookies for statistics, videos and map services as well as anonymous, technically necessary cookies.
Your consent to their use is voluntary and can be revoked at any time.
You can find a simple revocation option and further information in our privacy policy.